Morrison Water Treatment Plant
Evergreen, Colorado
Client
Burns and McDonnell
ESCO Construction has proven its excellence in managing a highly complex civil project under extreme spatial constraints and technical challenges.
Project Contract
$2.3M
ESCO Construction has proven its excellence in managing a highly complex civil project under extreme spatial constraints and technical challenges. This project underscores our dedication to innovation, precision, and collaborative problem-solving.
On a site where space was limited, ESCO successfully excavated approximately 9,000 cubic yards of soil, employing advanced soil nail shoring techniques to depths of 20-30 feet. One particularly challenging area required working within a 6-foot-wide corridor, with a building on one side and deep soil nail shoring on the other, showcasing our capability to handle high-risk, tight-space scenarios.
We faced the complexities of deep excavations and extensive shoring needs with innovative design solutions, covering an area of 3,000 square feet, which not only met but exceeded project specifications. In conditions where multiple trades were at work, ESCO efficiently backfilled 3,000 cubic yards under tight spatial constraints, ensuring seamless coordination with all involved parties to maintain project timelines.
The management of excess material was handled with logistical precision, demonstrating our ability to manage earthwork with minimal disruption. Site finishing included meticulous tasks like fine grading around the building perimeter and the strategic placement of asphalt milling for surfacing, alongside final soil stabilization to provide a solid foundation for subsequent construction phases.
Groundwater management was another critical aspect where ESCO excelled, using sophisticated techniques to prevent delays and maintain the integrity of the excavation site. Our approach to challenging, compact excavation areas further highlighted our strategic planning and execution capabilities, managing site conditions that were anything but straightforward.
This project not only met but surpassed the expectations set for this demanding environment, proving ESCO Construction’s capability in managing high-stakes, technically complex construction settings. We invite future clients to consider us for their next project, where we promise not just to build, but to innovate and excel.
Year Completed
November 2024